Construction process

Filter:
Facility commissioning:
1 construction stage – 2 квартал 2024 the year of.
The work is underway:
Section 1: Installation of vertical elements of the 8th floor.
Section 2:
-Installation of the ceiling over the 10th floor;
-laying of internal walls of the 2nd floor.
Installation of vertical elements and columns of the basement.
27.07.2023
foto
Browse through the photo report
30.08.2023
foto
Browse through the photo report
29.09.2023
foto
Browse through the photo report
31.10.2023
foto
Browse through the photo report
29.11.2023
foto
Browse through the photo report
29.12.2023
foto
Browse through the photo report
31.01.2024
foto
Browse through the photo report
29.02.2024
foto
Browse through the photo report
31.03.2024
foto
Browse through the photo report
01.05.2024
foto
Browse through the photo report
01.06.2024
foto
Browse through the photo report
..
foto
Browse through the photo report
01.08.2024
foto
Browse through the photo report
01.09.2024
foto
Browse through the photo report
..
foto
Browse through the photo report
01.11.2024
foto
Browse through the photo report