Facility commissioning:
1 construction stage – 2 квартал 2024 the year of.
The work is underway:
Section 1: Installation of vertical elements of the 8th floor.
Section 2:
-Installation of the ceiling over the 10th floor;
-laying of internal walls of the 2nd floor.
Installation of vertical elements and columns of the basement.